{"id":823,"date":"2026-05-07T04:27:24","date_gmt":"2026-05-07T04:27:24","guid":{"rendered":"https:\/\/skssynergies.com\/blog\/?p=823"},"modified":"2026-05-07T04:30:14","modified_gmt":"2026-05-07T04:30:14","slug":"factory-warehouse-solar-net-metering-chennai","status":"publish","type":"post","link":"https:\/\/skssynergies.com\/blog\/factory-warehouse-solar-net-metering-chennai\/","title":{"rendered":"Can My Factory or Warehouse in Chennai Get Net Metering From TANGEDCO for Solar?"},"content":{"rendered":"<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\" style=\"text-align: justify;\"><strong>Quick Answer<\/strong><\/p>\n<ul class=\"[li_&amp;]:mb-0 [li_&amp;]:mt-1 [li_&amp;]:gap-1 [&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc flex flex-col gap-1 pl-8 mb-3\" style=\"text-align: justify;\">\n<li class=\"whitespace-normal break-words pl-2\">Yes, factories and warehouses in Chennai can install rooftop solar and apply for TANGEDCO net metering under the industrial and commercial net metering provisions<\/li>\n<li class=\"whitespace-normal break-words pl-2\">Industrial and HT commercial connections have different net metering rules and capacity limits compared to domestic connections in Tamil Nadu<\/li>\n<li class=\"whitespace-normal break-words pl-2\">TANGEDCO permits net metering for industrial consumers up to a system capacity of 1MW \u2014 significantly higher than the 10kW residential limit<\/li>\n<li class=\"whitespace-normal break-words pl-2\">Industrial net metering billing works on a monthly settlement basis with export credits offset against import charges at applicable tariff rates<\/li>\n<li class=\"whitespace-normal break-words pl-2\">SKS Synergies designs and installs industrial rooftop solar systems across Chennai and manages the complete TANGEDCO net metering approval process for factories and warehouses<\/li>\n<\/ul>\n<hr class=\"border-border-200 border-t-0.5 my-3 mx-1.5\" \/>\n<h3 class=\"text-text-100 mt-3 -mb-1 text-[1.125rem] font-bold\" style=\"text-align: justify;\">Why Factories and Warehouses in Chennai Are Ideal Solar Candidates<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\" style=\"text-align: justify;\">Industrial and warehouse properties in Chennai represent some of the strongest candidates for rooftop solar installation \u2014 yet many factory owners and warehouse operators have not yet made the switch. The combination of large flat roof areas, high daytime electricity consumption, expensive industrial TANGEDCO tariffs, and the absence of subsidy constraints that limit residential system sizing makes industrial rooftop solar one of the highest-return solar investments available in Tamil Nadu.<\/p>\n<h2><a href=\"https:\/\/skssynergies.com\/blog\/solar-tariff-rate-tangedco\/\"><span style=\"font-size: 14pt; color: #0000ff;\"><em><strong>Tangedco solar ppa tariff 2026<\/strong><\/em><\/span><\/a><\/h2>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\" style=\"text-align: justify;\">A factory with 1,000 square metres of south-facing flat roof space can install a 100kW to 150kW solar system \u2014 generating 400 to 600 units per day and saving \u20b93,000 to \u20b95,000 per day at industrial tariff rates. The TANGEDCO net metering framework for industrial consumers makes this generation fully accountable \u2014 with every exported unit credited against import charges on the monthly electricity bill.<\/p>\n<h3 class=\"text-text-100 mt-3 -mb-1 text-[1.125rem] font-bold\" style=\"text-align: justify;\">How TANGEDCO Net Metering Works for Industrial Consumers in Chennai<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\" style=\"text-align: justify;\">The net metering framework for industrial and commercial consumers in Tamil Nadu operates on the same fundamental principle as residential net metering \u2014 export units are credited against import units on the monthly bill \u2014 but with several important differences in implementation.<\/p>\n<h4 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\" style=\"text-align: justify;\">Capacity limits for industrial net metering<\/h4>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\" style=\"text-align: justify;\">Residential consumers in Tamil Nadu can install rooftop solar systems up to 10kW under the PM Surya Ghar framework. Industrial and commercial consumers on LT connections can install up to 1MW of rooftop solar capacity under TANGEDCO&#8217;s commercial net metering provisions. HT industrial consumers have capacity limits defined by their sanctioned contract demand \u2014 with specific approval required from TANGEDCO for large-scale installations.<\/p>\n<h4 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\" style=\"text-align: justify;\">Billing settlement for industrial net metering<\/h4>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\" style=\"text-align: justify;\">Industrial net metering billing in Tamil Nadu is settled on a monthly basis. Export units generated by your solar system and fed back to the TANGEDCO grid are credited at the applicable export tariff rate \u2014 which may differ from the import tariff rate depending on your connection category and the applicable Tamil Nadu Solar Energy Policy provisions.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\" style=\"text-align: justify;\">The net monthly bill reflects the difference between import charges at your applicable industrial tariff and export credits at the applicable export rate \u2014 with any net credit carrying forward to the following billing period.<\/p>\n<h4 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\" style=\"text-align: justify;\">Connection category and tariff implications<\/h4>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\" style=\"text-align: justify;\">The net metering financial benefit for an industrial consumer depends significantly on their TANGEDCO connection category. LT commercial consumers paying \u20b96.00 to \u20b97.50 per unit and HT industrial consumers paying \u20b95.50 to \u20b98.00 per unit depending on demand and consumption levels all achieve strong net metering savings \u2014 but the exact financial model varies by connection type and must be calculated specifically for each installation.<\/p>\n<h3 class=\"text-text-100 mt-3 -mb-1 text-[1.125rem] font-bold\" style=\"text-align: justify;\">What TANGEDCO Approval Process Does a Factory or Warehouse Need in Chennai<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\" style=\"text-align: justify;\">The TANGEDCO approval process for industrial rooftop solar net metering is more involved than the residential process \u2014 reflecting the larger system sizes and grid impact considerations for industrial-scale installations.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\" style=\"text-align: justify;\">The process begins with a technical feasibility application to the local TANGEDCO section office \u2014 submitting your current electricity bill, property ownership documents, proposed system size, and a preliminary system design report. TANGEDCO reviews the application against grid capacity in your area and your connection&#8217;s sanctioned demand.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\" style=\"text-align: justify;\">Following feasibility approval your MNRE-empanelled installer completes the system installation and submits commissioning documentation to TANGEDCO. A TANGEDCO inspector verifies the installation against safety standards and grid connection requirements before approving net meter installation.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\" style=\"text-align: justify;\">For HT industrial consumers above a certain capacity threshold a TANGEDCO grid impact assessment may be required \u2014 evaluating whether the proposed solar system&#8217;s export capacity can be absorbed by the local grid infrastructure without voltage or stability issues.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\" style=\"text-align: justify;\">SKS Synergies manages the complete TANGEDCO approval process for all industrial and commercial solar installations in Chennai \u2014 from initial feasibility application through to net meter commissioning and first billing cycle verification.<\/p>\n<h3 class=\"text-text-100 mt-3 -mb-1 text-[1.125rem] font-bold\" style=\"text-align: justify;\">Roof Suitability Considerations for Factory and Warehouse Solar in Chennai<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\" style=\"text-align: justify;\">Factory and warehouse rooftops in Chennai present unique installation considerations compared to residential rooftops. Most industrial buildings use GI sheet or Mangalore tile shed roofing rather than flat RCC terraces \u2014 requiring specialised mounting systems designed for metal sheet or tile roof installation.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\" style=\"text-align: justify;\">GI sheet roofing \u2014 common in Chennai&#8217;s industrial estates including Ambattur, Guindy, and Manali \u2014 requires hook and clamp mounting systems that attach to the roof purlin structure without penetrating the sheet surface. This avoids roof leakage risk and maintains structural integrity while supporting panel loads effectively.<\/p>\n<hr class=\"border-border-200 border-t-0.5 my-3 mx-1.5\" \/>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\" style=\"text-align: justify;\"><strong>Key Takeaways<\/strong><\/p>\n<ul class=\"[li_&amp;]:mb-0 [li_&amp;]:mt-1 [li_&amp;]:gap-1 [&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc flex flex-col gap-1 pl-8 mb-3\" style=\"text-align: justify;\">\n<li class=\"whitespace-normal break-words pl-2\">Factories and warehouses in Chennai can install rooftop solar and access TANGEDCO net metering under commercial and industrial provisions<\/li>\n<li class=\"whitespace-normal break-words pl-2\">Industrial net metering capacity limits go up to 1MW \u2014 far beyond the 10kW residential limit<\/li>\n<li class=\"whitespace-normal break-words pl-2\">Industrial net metering billing settles monthly with export credits offsetting import charges at applicable tariff rates<\/li>\n<li class=\"whitespace-normal break-words pl-2\">The TANGEDCO approval process for industrial solar is more involved than residential \u2014 requiring feasibility application and grid impact assessment for large systems<\/li>\n<li class=\"whitespace-normal break-words pl-2\">SKS Synergies manages complete TANGEDCO approval and installation for industrial and warehouse solar projects across Chennai<\/li>\n<\/ul>\n<hr class=\"border-border-200 border-t-0.5 my-3 mx-1.5\" \/>\n<h3 class=\"text-text-100 mt-3 -mb-1 text-[1.125rem] font-bold\" style=\"text-align: justify;\">Frequently Asked Questions<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\" style=\"text-align: justify;\"><strong>What is the maximum solar system size a factory in Chennai can install under TANGEDCO net metering?<\/strong> LT commercial and industrial consumers in Tamil Nadu can install rooftop solar up to 1MW under TANGEDCO net metering provisions. HT consumers have limits defined by their contract demand \u2014 specific approval is required from TANGEDCO for installations above these thresholds.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\" style=\"text-align: justify;\"><strong>Can a warehouse in Chennai with a GI sheet roof install solar panels?<\/strong> Yes. GI sheet roofs are suitable for solar installation using specialised hook and clamp mounting systems that attach to the purlin structure without penetrating the sheet surface. SKS Synergies has extensive experience installing solar on industrial GI sheet roofing across Chennai&#8217;s industrial estates.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\" style=\"text-align: justify;\"><strong>How long does TANGEDCO net metering approval take for a factory in Chennai?<\/strong> Industrial net metering approval timelines in Chennai typically range from 4 to 12 weeks depending on system size, connection category, and TANGEDCO&#8217;s current processing workload in your area. Larger HT installations requiring grid impact assessment may take longer.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\" style=\"text-align: justify;\"><strong>Does a factory in Chennai need to inform its insurance provider after installing solar?<\/strong> Yes. Installing a rooftop solar system is a material change to the insured property that should be declared to your property insurance provider. Most insurers can extend coverage to include the solar system \u2014 SKS Synergies advises all commercial customers to update their insurance documentation after installation.<\/p>\n<hr class=\"border-border-200 border-t-0.5 my-3 mx-1.5\" \/>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\" style=\"text-align: justify;\"><strong>Ready to install solar and access net metering for your Chennai factory or warehouse? SKS Synergies handles everything from TANGEDCO approval to commissioning for industrial properties across all Chennai localities. WhatsApp us today and our industrial solar team will assess your property and design the right system for your business.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Quick Answer Yes, factories and warehouses in Chennai can install rooftop solar and apply for TANGEDCO net metering under the industrial and commercial net metering provisions Industrial and HT commercial connections have different net metering rules and capacity limits compared to domestic connections in Tamil Nadu TANGEDCO permits net metering for industrial consumers up to [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","_joinchat":[],"footnotes":""},"categories":[1],"tags":[],"class_list":["post-823","post","type-post","status-publish","format-standard","hentry","category-solar-panel"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Can Factories &amp; Warehouses in Chennai Get Solar Net Metering?<\/title>\n<meta name=\"description\" content=\"Can your factory or warehouse in Chennai install solar &amp; get TANGEDCO net metering? Know rules, capacity limits &amp; approval process for solar.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skssynergies.com\/blog\/factory-warehouse-solar-net-metering-chennai\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Can Factories &amp; Warehouses in Chennai Get Solar Net Metering?\" \/>\n<meta property=\"og:description\" content=\"Can your factory or warehouse in Chennai install solar &amp; get TANGEDCO net metering? Know rules, capacity limits &amp; approval process for solar.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skssynergies.com\/blog\/factory-warehouse-solar-net-metering-chennai\/\" \/>\n<meta property=\"og:site_name\" content=\"SKS Synergies\" \/>\n<meta property=\"article:published_time\" content=\"2026-05-07T04:27:24+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-07T04:30:14+00:00\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skssynergies.com\\\/blog\\\/factory-warehouse-solar-net-metering-chennai\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skssynergies.com\\\/blog\\\/factory-warehouse-solar-net-metering-chennai\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/skssynergies.com\\\/blog\\\/#\\\/schema\\\/person\\\/199fe5c843a24f77173950679405bc4c\"},\"headline\":\"Can My Factory or Warehouse in Chennai Get Net Metering From TANGEDCO for Solar?\",\"datePublished\":\"2026-05-07T04:27:24+00:00\",\"dateModified\":\"2026-05-07T04:30:14+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skssynergies.com\\\/blog\\\/factory-warehouse-solar-net-metering-chennai\\\/\"},\"wordCount\":1205,\"articleSection\":[\"Solar Panel\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skssynergies.com\\\/blog\\\/factory-warehouse-solar-net-metering-chennai\\\/\",\"url\":\"https:\\\/\\\/skssynergies.com\\\/blog\\\/factory-warehouse-solar-net-metering-chennai\\\/\",\"name\":\"Can Factories & Warehouses in Chennai Get Solar Net Metering?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skssynergies.com\\\/blog\\\/#website\"},\"datePublished\":\"2026-05-07T04:27:24+00:00\",\"dateModified\":\"2026-05-07T04:30:14+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/skssynergies.com\\\/blog\\\/#\\\/schema\\\/person\\\/199fe5c843a24f77173950679405bc4c\"},\"description\":\"Can your factory or warehouse in Chennai install solar & get TANGEDCO net metering? Know rules, capacity limits & approval process for solar.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skssynergies.com\\\/blog\\\/factory-warehouse-solar-net-metering-chennai\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skssynergies.com\\\/blog\\\/factory-warehouse-solar-net-metering-chennai\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skssynergies.com\\\/blog\\\/factory-warehouse-solar-net-metering-chennai\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skssynergies.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Can My Factory or Warehouse in Chennai Get Net Metering From TANGEDCO for Solar?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skssynergies.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/skssynergies.com\\\/blog\\\/\",\"name\":\"My Blog\",\"description\":\"Solar Panel Installation Company\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skssynergies.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skssynergies.com\\\/blog\\\/#\\\/schema\\\/person\\\/199fe5c843a24f77173950679405bc4c\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/179605562a636f50b75631e3d497b27dafe5562bd214427afdcc2f2fa7076796?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/179605562a636f50b75631e3d497b27dafe5562bd214427afdcc2f2fa7076796?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/179605562a636f50b75631e3d497b27dafe5562bd214427afdcc2f2fa7076796?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\\\/\\\/skssynergies.com\\\/blog\"],\"url\":\"https:\\\/\\\/skssynergies.com\\\/blog\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Can Factories & Warehouses in Chennai Get Solar Net Metering?","description":"Can your factory or warehouse in Chennai install solar & get TANGEDCO net metering? Know rules, capacity limits & approval process for solar.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skssynergies.com\/blog\/factory-warehouse-solar-net-metering-chennai\/","og_locale":"en_US","og_type":"article","og_title":"Can Factories & Warehouses in Chennai Get Solar Net Metering?","og_description":"Can your factory or warehouse in Chennai install solar & get TANGEDCO net metering? Know rules, capacity limits & approval process for solar.","og_url":"https:\/\/skssynergies.com\/blog\/factory-warehouse-solar-net-metering-chennai\/","og_site_name":"SKS Synergies","article_published_time":"2026-05-07T04:27:24+00:00","article_modified_time":"2026-05-07T04:30:14+00:00","author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skssynergies.com\/blog\/factory-warehouse-solar-net-metering-chennai\/#article","isPartOf":{"@id":"https:\/\/skssynergies.com\/blog\/factory-warehouse-solar-net-metering-chennai\/"},"author":{"name":"admin","@id":"https:\/\/skssynergies.com\/blog\/#\/schema\/person\/199fe5c843a24f77173950679405bc4c"},"headline":"Can My Factory or Warehouse in Chennai Get Net Metering From TANGEDCO for Solar?","datePublished":"2026-05-07T04:27:24+00:00","dateModified":"2026-05-07T04:30:14+00:00","mainEntityOfPage":{"@id":"https:\/\/skssynergies.com\/blog\/factory-warehouse-solar-net-metering-chennai\/"},"wordCount":1205,"articleSection":["Solar Panel"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/skssynergies.com\/blog\/factory-warehouse-solar-net-metering-chennai\/","url":"https:\/\/skssynergies.com\/blog\/factory-warehouse-solar-net-metering-chennai\/","name":"Can Factories & Warehouses in Chennai Get Solar Net Metering?","isPartOf":{"@id":"https:\/\/skssynergies.com\/blog\/#website"},"datePublished":"2026-05-07T04:27:24+00:00","dateModified":"2026-05-07T04:30:14+00:00","author":{"@id":"https:\/\/skssynergies.com\/blog\/#\/schema\/person\/199fe5c843a24f77173950679405bc4c"},"description":"Can your factory or warehouse in Chennai install solar & get TANGEDCO net metering? Know rules, capacity limits & approval process for solar.","breadcrumb":{"@id":"https:\/\/skssynergies.com\/blog\/factory-warehouse-solar-net-metering-chennai\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skssynergies.com\/blog\/factory-warehouse-solar-net-metering-chennai\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skssynergies.com\/blog\/factory-warehouse-solar-net-metering-chennai\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skssynergies.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Can My Factory or Warehouse in Chennai Get Net Metering From TANGEDCO for Solar?"}]},{"@type":"WebSite","@id":"https:\/\/skssynergies.com\/blog\/#website","url":"https:\/\/skssynergies.com\/blog\/","name":"My Blog","description":"Solar Panel Installation Company","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skssynergies.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/skssynergies.com\/blog\/#\/schema\/person\/199fe5c843a24f77173950679405bc4c","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/179605562a636f50b75631e3d497b27dafe5562bd214427afdcc2f2fa7076796?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/179605562a636f50b75631e3d497b27dafe5562bd214427afdcc2f2fa7076796?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/179605562a636f50b75631e3d497b27dafe5562bd214427afdcc2f2fa7076796?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/skssynergies.com\/blog"],"url":"https:\/\/skssynergies.com\/blog\/author\/admin\/"}]}},"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/skssynergies.com\/blog\/wp-json\/wp\/v2\/posts\/823","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skssynergies.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skssynergies.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skssynergies.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/skssynergies.com\/blog\/wp-json\/wp\/v2\/comments?post=823"}],"version-history":[{"count":2,"href":"https:\/\/skssynergies.com\/blog\/wp-json\/wp\/v2\/posts\/823\/revisions"}],"predecessor-version":[{"id":833,"href":"https:\/\/skssynergies.com\/blog\/wp-json\/wp\/v2\/posts\/823\/revisions\/833"}],"wp:attachment":[{"href":"https:\/\/skssynergies.com\/blog\/wp-json\/wp\/v2\/media?parent=823"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skssynergies.com\/blog\/wp-json\/wp\/v2\/categories?post=823"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skssynergies.com\/blog\/wp-json\/wp\/v2\/tags?post=823"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}